NotebookCHECK - Notebook Forum
English => News => Topic started by: Redaktion on February 20, 2025, 14:07:56
The infrastructure will cover 50,000 kilometers, connecting the five continents with the 24-fiber-pair cable. By the end of the decade, the subsea cable is expected to be operational.https://www.notebookcheck.net/Meta-announces-the-construction-of-the-largest-submarine-cable.964711.0.html