News:

Willkommen im Notebookcheck.com Forum! Hier können sie über alle unsere Artikel und allgemein über Notebook relevante Dinge disuktieren. Viel Spass!

Main Menu

Intel's D1X Oregon fab first to get 7 nm production node

Started by Redaktion, February 06, 2019, 20:27:39

Previous topic - Next topic

Redaktion

It is now clear that AMD will be first to launch 7 nm desktop CPUs, but Intel is not sitting on its hands. Even after all the problems it faced in 2018, Intel is now carefully planning for its upcoming 7 nm CPUs.  According to sources from Oregon, the D1X fab will be the first one to manufacture 7 nm CPUs, and the facility is currently going through an expansion that will take at least 1.5 years, so the first 7 nm CPUs from intel could arrive in late 2020.

https://www.notebookcheck.net/Intel-s-D1X-Oregon-fab-first-to-get-7-nm-production-node.403611.0.html

Angaelo

Since it's 18 months just of building (starting mod year) and several months of getting the fab ready (that usually means 6-12), it's probably at least late 2021/early 2022 for a first consumer product to hit the market

S.Yu

Isn't every Intel node denser than the TSMC node with the same nomenclature? Don't know if Intel's 10nm will match TSMC's 7nm though.

Quick Reply

Warning: this topic has not been posted in for at least 120 days.
Unless you're sure you want to reply, please consider starting a new topic.

Name:
Email:
Verification:
Please leave this box empty:

Shortcuts: ALT+S post or ALT+P preview